Baseline-systems BHM Series Hydrometer Instrukcja Użytkownika Strona 15

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
Przeglądanie stron 14
Hydrometers Operation and Maintenance Manual15
Drainage Valve
DRAINAGE VALVE
At the beginning of the winter it is necessary to drain the water from the pipeline in order to
prevent the pipes from bursting. (Please refer to the drawing below)
Before draining, it is very important to ensure that there is no pressure in the line.
Dissassemble plug (1)
Assemble the drainage ball valve (2)
Assemble elbow (3)
CAUTION: Do not use compressed air to blow out hydrometer.
Przeglądanie stron 14
1 2 ... 10 11 12 13 14 15 16 17 18 19 20 ... 51 52

Komentarze do niniejszej Instrukcji

Brak uwag